Before you sign final handover acceptance, your property must be delivered exactly to the agreed specification. Our snagging services provide structured inspection, full defect documentation, and developer coordination — protecting your investment before you sign.

Professional snagging inspection Dubai — MMP
20+ Years UAE Property Experience
1,000+ Properties Managed in UAE
98% Average Occupancy Rate
What Is Snagging

What Is Property Snagging — and Why Does It Matter?

Snagging is the structured inspection of a newly completed or off-plan property before you sign final handover acceptance. During this stage, construction defects, unfinished work, and quality issues are identified and documented while the developer is still legally responsible for fixing them.

This is a narrow window. Once you sign, repair responsibility shifts to you permanently.

Without a professional snagging inspection:

  • Construction defects accepted unknowingly at handover
  • Developer's defect liability period expires before issues are documented
  • Finishing quality problems become the owner's repair cost
  • Long-term maintenance costs increase from day one
  • Off-plan investors lose all leverage with the developer permanently
Property snagging inspection Dubai
What We Do

Our Snagging & Handover Management Services

Every snagging inspection follows a structured process — nothing is skimmed, nothing is assumed. Here is exactly what we cover.

1. Detailed Snagging Inspections

  • Full inspection of all interiors and finishes
  • Testing of fixtures, fittings, doors, windows and utilities
  • Identification of all visible and functional defects
  • Coverage of electrical, plumbing, AC, flooring, ceilings and paintwork

2. Defect Identification & Documentation

  • Detailed snag list preparation — every issue recorded
  • Photographic documentation of all defects
  • Categorisation by severity and priority
  • Formal report produced and ready for developer submission

3. Developer Coordination & Follow-Up

  • Submission of snag report directly to developer
  • Active follow-up on rectification timelines
  • Direct communication with developer representatives
  • Escalation management where developers delay

4. Final Handover Verification

  • Re-inspection after developer rectification
  • Confirmation that all documented defects are resolved
  • Quality assurance sign-off before acceptance
  • Clear guidance on whether the property is ready to accept

5. Leasing & Occupancy Readiness Assessment

  • Property condition evaluation for immediate rental listing
  • Identification of any items to address before tenant placement
  • Coordination with MMP property management if ongoing management is required
Full Coverage

What a Full MMP Snagging Inspection Covers

  • Painting & plastering works
  • Flooring & ceiling coverings
  • General plumbing tests
  • Water pressure & flow checks
  • Mechanical, electrical & plumbing (MEP)
  • Air conditioning & heating
  • Switches, plugs & intercom
  • White goods & appliances
  • Doors, locks & mechanisms
  • Window frames & handles
  • Balcony, terrace & patio areas
  • General property overview
Why It Matters

What Happens Without Professional Snagging — and With It

❌  Without Professional Snagging ✓  With MMP Snagging
You sign handover without a defect list Every defect is documented before you sign
Developer claims defects happened post-handover Photographic evidence locks developer liability in place
Minor issues become expensive owner repairs Defects rectified by developer at no cost to you
No leverage to negotiate outstanding items Formal snag report creates structured negotiating leverage
Tenant move-in reveals problems you didn't know about Property verified ready before any tenant is placed
Off-plan investment starts with hidden repair liabilities You accept the property on your terms, not the developer's
Timing

When Should You Book a Snagging Inspection?

Timing is everything. The developer's defects liability period is time-bound. Here is the correct sequence.

1

Before the Handover Appointment

Book your snagging inspection before you attend the official handover meeting with the developer. This is the optimal window — defects are documented before any acceptance has been signed and the developer is still fully liable.

2

At the Handover Meeting

Bring the MMP snag report to the handover meeting. Do not sign unconditional acceptance — formally note all outstanding items on the handover documentation before signing.

3

During the Defects Liability Period

If handover has already occurred, you may still be within the developer's defects liability period (typically 12 months from handover). Act immediately — this window closes and does not reopen.

The golden rule

Never sign unconditional acceptance of a property handover before a professional snagging inspection has been completed. Once signed, repair responsibility shifts to you permanently — regardless of when defects were caused.

Who We Help

Who Uses MMP Snagging Services?

🏢

Off-Plan Investors

Protecting your investment from developer-caused defects before the defects liability period expires. The most critical window in any off-plan purchase.

✈️

Overseas Landlords

Cannot attend in person? MMP handles the full inspection and coordinates with the developer entirely on your behalf — no flights required.

🏠

Local Property Owners

Attending handover but want a professional eye — someone with construction knowledge who knows exactly what to look for and how to document it correctly.

Don't Sign Handover Without a Professional Snagging Report.

Most defects that become expensive repair problems were visible — and fixable by the developer — before handover acceptance. The inspection pays for itself in the first repair you don't have to fund.

Book a Snagging Inspection
FAQ

Frequently Asked Questions

How long does a snagging inspection take?
Depending on property size, a standard Dubai apartment snagging inspection takes between 2 and 4 hours. Larger units or villas take longer. You will receive a written report with photographs within 24–48 hours of the inspection.
Can I do snagging after I have already accepted handover?
Yes — if you are still within your developer's defects liability period (typically 12 months from the handover date). However, the earlier you act, the stronger your leverage. Once the liability period expires, all repair costs fall to you regardless of when defects were caused.
Does MMP only snag residential properties?
No. We carry out snagging inspections for residential apartments, villas, townhouses, and commercial units. If you are receiving a commercial property handover, the same principle applies — defects must be documented before acceptance.
What happens if the developer refuses to fix items on the snag list?
A formally documented snag report significantly strengthens your position in any dispute. MMP provides structured follow-up communication and can assist with escalation to the developer's management or, where necessary, to relevant authorities. Having a professional report as evidence is the critical first step in any such case.
Can MMP handle snagging and then continue to manage the property?
Yes — and many clients find this the most practical approach. MMP's snagging service integrates directly with our ongoing property management. After handover verification, we can immediately begin tenant sourcing, Ejari registration, and full property management under a single agreement.
How much does a snagging inspection cost in Dubai?
Snagging inspection fees vary based on property size and type. Contact MMP directly for a quote — the cost is a fraction of the repair liabilities a professional inspection typically prevents.